RICS regulated chartered surveyorsNationwide coverage from 10 regional locations
Projects & delivery

MEES Compliance Pathway

A planned route to energy compliance for your property stock. Working with specialist M&E consultants and energy assessors, we keep buildings lettable today and ready for the stricter standards ahead. Critical works are timed around key lease dates to minimise disruption to occupiers, and capital budgets are planned years in advance.

Why plan now?

Privately rented non-domestic property in England and Wales must currently have an EPC rating of at least E, unless a valid exemption is registered. In June 2026 the Government confirmed its direction of travel: an interim response proposes EPC B from 2031 for rented commercial buildings over 1,000 m², where improvements are cost-effective. A full response, and the regulations to bring it into force, are still to follow. Read our MEES update.

For a typical commercial lease, 2031 is only one or two lease events away. Buildings that cannot reach the required rating risk letting restrictions, penalties of up to £150,000 and a lower value. Owners who start planning now can do the work at the right moment, at the right cost, instead of under pressure at the last minute.

The cheapest time to improve a building’s energy performance is when it is empty, when plant is due for replacement anyway, or when other works are already planned.

How the pathway works

1. Portfolio EPC and MEES risk audit

We review every asset in the portfolio and rank the risk:

  • Current EPC ratings, scores and certificate expiry dates
  • Floor areas against the proposed 1,000 m² threshold
  • Registered exemptions and when they expire
  • Lease events: expiries, breaks, rent reviews and voids
  • Building condition and the remaining life of key plant

2. Improvement plan with M&E consultants

We bring in trusted mechanical and electrical (M&E) consultants and accredited energy assessors. Together we model which measures will lift each building to its target rating, in what order and at what cost. Typical measures include:

  • LED lighting and lighting controls
  • Heating, cooling and ventilation upgrades
  • Heat pumps and low-carbon heating
  • Building management systems and controls
  • Roof, wall and floor insulation
  • Glazing and air-tightness improvements
  • Hot water system upgrades
  • On-site renewables such as solar PV

We coordinate the team so that you receive one clear, costed plan for each building, not a collection of separate reports.

3. Works timed to key dates

Using each property’s key dates, we schedule critical works for the moments that cause least disruption and cost:

  • Voids and lease expiries. Major works with vacant possession, ahead of re-letting.
  • Break dates and renewals. Improvements agreed as part of new lease terms.
  • Plant end of life. Replacing equipment with efficient systems when it is due anyway, through planned preventative maintenance.
  • Tenant fit-outs and dilapidations settlements. Aligning works with activity already planned on site.
  • Occupied buildings. Phased, out-of-hours or zoned working that protects the tenant’s beneficial occupation, in line with the landlord’s rights of access under the lease.

Clients on our Lease Compliance Subscription already have the key dates register this depends on.

4. Capex budgets and wider financial planning

Each pathway includes a phased capital expenditure budget showing what needs to be spent, on which building, and when. It is designed to sit within your wider budget planning:

  • Year-by-year capex forecasts across the portfolio
  • Combined with lifecycle and planned maintenance costs, so money is not spent twice
  • Advice on which costs may be recoverable through the service charge, depending on lease terms
  • Evidence for exemptions where measures are not cost-effective
  • Reporting suitable for boards, investment committees, trustees and lenders

5. Delivery and new EPCs

We then deliver the works: specification, competitive tender, contract administration and project management through to completion. A new EPC is lodged to confirm the improved rating.

Who it is for

Investors, pension funds, SIPP providers, SSAS trustees and portfolio landlords who want to protect rental income and capital value, and keep their buildings lettable as standards rise.

Please note: MEES policy is still developing. We track Government announcements and update each pathway as the final regulations, thresholds and dates are confirmed.

How we work

A clear process, from instruction to outcome

  1. Brief & SLA

    We agree scope, priorities and timescales, and every new client receives a service level agreement.

  2. Inspection

    A chartered surveyor attends site. You receive headline feedback within hours, not weeks.

  3. Tailored report

    No standard templates. Reporting focuses on your brief, your liabilities and your stakeholders.

  4. Action & support

    We negotiate, manage and monitor through to settlement, completion or handover.

Related services

Often instructed alongside

View all services
Get in touch

Let’s talk about your property portfolio

Whether it’s a single asset or a national estate, speak to a chartered surveyor today. We respond to every enquiry within one working day.